Olympic Park Design and Site-Wide Infrastructure, London
Project undertaken by Buro Happold

Client: Olympic Delivery Authority
 
We were appointed to develop design proposals for the London 2012 Olympic Park and sitewide infrastructure for the London 2012 Olympic and Paralympic Games. Other consortium members within the EDAW led team were architects Allies & Morrison and Populous. As lead designers, the consortium was supported by Arup and WS Atkins, who were appointed to assist with the project.
 
We provided masterplanning; site remediation; hydrology; ecology; waste management; utilities; security; topographical design; earthworks modelling; river engineering; flood risk assessment and prevention; energy and sustainability strategies; bridge engineering; highways design and traffic engineering, fire engineering design and risk assessment, inclusive design.